Carl Walker Construction

Ruby Memorial Hospital Garage Expansion

Home > Projects > View All > Ruby Memorial Hospital Garage Expansion
Print this page Print This Page

View All Projects

Back


Category: New Parking Structure Projects

Industry: Hospital

Location: Morgantown, WV

Project Owner: West Virginia University Hospitals

Architect: type 2

Contact Info: Josh Clavis (304) 598-4125

Assignment: Vertical expansion of garage

Type of Assignment: Design/build

Capacity: 355 cars

Value: $2 Million

Date of Completion: Summer 2007

Project Description:

This assignment entailed the addition of a steel post-tensioned parking level to an existing precast parking structure at Ruby Memorial Hospital. The additional level added 105 cars to the garage’s capacity, and required extensive strengthening of the existing structure to support the incremental load. Once the structure of the precast garage was augmented with support members tied in to the original grade beams, the steel components were added to create the new parking level. All steel surfaces were sheathed in precast covers to visually integrate the newly constructed level with the existing structure. The garage was kept open during construction activities to support the needs of the hospital.

 

View Case Study

Read Article in Modern Steel Construction