2017


Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: Smithfield Oliver Partners

Architect: Churches Engineering

Size: 650 spaces (7 levels)

Value: $22,700,000

Start Date: Spring 2015

Date of Completion: Winter 2017


2016


Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: Three Crossings, LP

Size: 590 spaces (4 levels)

Value: $9,890,000

Start Date: Fall 2015

Date of Completion: Fall 2016


2015



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: Kossman Development

Architect: Indovina Associates

Size: 250 spaces

Value: $3,200,000

Start Date: Fall 2014

Date of Completion: Fall 2015


2014


Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: Cochran Nissan

Architect: Churches Engineering

Assignment: Design Build

Size: 58,000 Square Feet

Value: $3,450,000

Start Date: Summer 2013

Date of Completion: Spring 2014

Project Description: 1-level parking structure for Cochran Car Dealership on West Liberty Avenue in Pittsburgh. A portion of project is designed to be over top of the Port Authority light transit station.

2013


Category: New Parking Structure Projects

Industry: Corporate

Location: Pittsburgh, PA

Project Owner: USAA Real Estate

Architect: Churches Engineering

Assignment: Design Build

Size: 105,000 Square Feet

Capacity: 600 Vehicles

Value: $6,484,000

Start Date: Fall 2012

Date of Completion: Summer 2013

Project Description: Two pre-cast parking structures were designed and built to service two separate office buildings. Both were 300-car capacity. Carl Walker Construction worked with the developer in Texas and handled all the initial planning, zoning,and meetings through final construction with the owner.

Category: New Parking Structure Projects

Industry: Hospital

Location: Cincinnatti, OH

Project Owner: United States Government

Assignment: Design Build

Size: 247,000 Square Feet

Capacity: 700 Vehicles

Value: $8,666,150.00

Date of Completion: Fall 2013


2012


Category: New Parking Structure Projects

Industry: University

Location: Pittsburgh, PA

Project Owner: Impakt Development Inc.

Assignment: Design Build

Size: 32,000 Square Feet

Capacity: 86 Vehicles

Value: $1,295,219.00

Date of Completion: Summer 2012



Category: New Parking Structure Projects

Industry: Casino

Location: Washington, PA

Project Owner: Cannery Casino Resorts

Assignment: Design Build

Size: 408,000 Square Feet

Capacity: 1,362 Vehicles

Value: $14,062,384.00

Date of Completion: Spring 2012



Category: New Parking Structure Projects

Industry: University

Location: Huntington, WV

Project Owner: Marshall University

Architect: Indovina Architects

Contact Info: Ronald May - 304-696-6415

Assignment: Design Build

Size: 108,000 Square Feet - Supported

Capacity: 450 Vehicles

Value: $6,773,750

Date of Completion: Summer 2012

Project Description:

Design and Build Marshall University Parking Garage


2011


Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: Kratsas Properties

Assignment: Design Build

Size: 60,000 Square Feet

Capacity: 81 Vehicles

Value: $3,006,017.00

Date of Completion: Fall 2011


2010


Category: New Parking Structure Projects

Industry: Hospital

Location: Cleveland, Ohio

Project Owner: Veteran's Administration

Architect: Dan Ramer

Contact Info: Katrina Winters | (440) 526-3030

Assignment: Design Build

Size: 115,200 Square Feet

Capacity: 362 Vehicles

Value: $4,800,000

Start Date: Summer 2009

Date of Completion: Spring 2010


Project Description:

This design/build assignment will feature a cast-in-place frame and post-tensioned parking deck surfaces.  The new parking garage addition will expand the capacity of the VA's existing 302,000 square foot parking facility, which currently features four stories and 825 parking spaces. Engineered to accommodate future vertical expansion, the cast-in-place frame of the new parking structure can support three additional parking levels.

View News Release


Category: New Parking Structure Projects

Industry: Hospital

Location: Mineola, New York

Project Owner: Winthrop University Hospital

Architect: McGuire Group

Contact Info: Dan Abruzzese

Assignment: Design Build

Size: 216,000 Square Feet

Capacity: 700 Vehicles

Value: $17,300,000

Start Date: Winter 2008

Date of Completion: Fall 2010

Project Description:

Carl Walker Construction, Inc. added three (3) additional floors to Winthrop's existing parking structure. The vertical addition consists of three (3) post-tensioned, cast-in-place concrete decks supported by a steel frame.


2009



Category: New Parking Structure Projects

Industry: Casino

Location: Bethlehem, Pennsylvania

Project Owner: Sands Bethworks Gaming LLC

Architect: RTKL

Contact Info: Frank Devlin

Assignment: Design Build

Size: 1,100,000 Square Feet

Capacity: 3,200 Vehicles

Value: $40,000,000

Start Date: Summer 2008

Date of Completion: Winter 2009

 

 

 
Project Description:

Comprised of 9.5 million pounds of steel, the frame of the garage will be galvanized for corrosion protection.  The structure supporting the concrete decks will consist of castellated beams - hybrid girders that offer superior load bearing qualities while requiring less steel per  lineal foot.

View Case Study

View News Release

View Article

 

 


Category: New Parking Structure Projects

Industry: Casino

Location: Washington, PA

Project Owner: Cannery Casino Resorts

Architect: Climans Green Liang

Contact Info: Tim Jones, LPCiminelli

Assignment: Design Build

Size: 327,000 Square Feet

Capacity: 1,000 Vehicles

Value: $13,600,000

Start Date: Spring 2008

Date of Completion: Spring 2009

 

 
Project Description:

This garage incorporates a pre-stressed, pre-cast concrete frame and cast-in-place deck surfaces, and will join the casino at a shared column line, featuring a firewall separating the two structures.

View Case Study

View New Release

 

 

2008



Category: New Parking Structure Projects

Industry: Government

Location: Pittsburgh, PA

Project Owner: Urban Redevelopment Authority of Pittsburgh

Architect: Indonvina Associates

Type of Assignment: Design/Build

Capacity: 726 Vehicles

Value: $10,500,000.00

Start Date: Winter 2008

Date of Completion: Fall 2008

Project Description:

View News Release


2007



Category: New Parking Structure Projects

Industry: University

Location: Erie, PA

Project Owner: Penn State University

Architect: Weber Murphy Fox, Mr. Dennis Wilkins, Erie, PA (814-836-1616)

Contact Info: Mr. Bruce Rohrbach. (814-777-3790)

Assignment: Design/Bid/Build

Size: 52,560 sq. feet

Capacity: 180 cars

Value: $4 million

Start Date: Summer 2006

Date of Completion: Fall 2007

Project Description:

The project consists of a two- and one-half (2-1/2) level (grade and 1-1/2 levels), precast concrete parking structure. The structure features a glass tower stair/elevator enclosure and the extensive use of masonry facade treatments. The project will consist of 52,560 sq. ft. of area (24,000 sq. ft.  on grade) and provide 165 parking spaces. The project is intended to service a new technology park affiliated with the university.

 

View Case Study



Category: New Parking Structure Projects

Industry: Government

Location: Washington, PA

Project Owner: Mr. Bob Griffin, Redevelopment Authority, Director of Construction Management of the County of Washington (RACW), (724) 228-6875

Architect: Mr. Rob Indovina, Indovina Associates Architects, (412) 363-3800

Value: $11,795,809

Start Date: Spring 2006

Date of Completion: Spring 2007

CWC Contract: $11,795,809

Project Description:

This 250,000 sq. ft. (180,000 sq. ft. supported), precast concrete parking structure is intended to provide 850 parking spaces to support a major multi-use downtown redevelopment project for the city of Washington, PA central business district. Significant architectural design features include the use of brick-faced panels at prominent locations and expansive use of glass in the stair elevator towers. Carl Walker Construction (CWC) was awarded the project on a design/build basis through a formal competition that evaluated proposals on a two-part evaluation: 1) how effectively defined design criteria were met and 2) price. Points were awarded on an equal-weight basis for each category, with the project awarded to the proposal with the most total points. CWC won both categories and was awarded the project.

 

View Case Study
View Video



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: McCaffrey Interests

Contact Info: Ethnie Richardson (703) 351-9500

Assignment: Retaining Wall Installation

Value: $2.2 Million

Date of Completion: Fall 2007

Project Description:

This assignment entailed installation of a steel, king-pile retaining wall along the bank of the Allegheny River. The wall provides support for the River Walk, which allows Cork Factory residents direct access to the picturesque riverbank. The wall also protects the site from erosion and flooding. The structure is an integral component of a new marina complex that is currently under construction.

View Video



Category: New Parking Structure Projects

Industry: Hospital

Location: Morgantown, WV

Project Owner: West Virginia University Hospitals

Architect: type 2

Contact Info: Josh Clavis (304) 598-4125

Assignment: Vertical expansion of garage

Type of Assignment: Design/build

Capacity: 355 cars

Value: $2 Million

Date of Completion: Summer 2007

Project Description:

This assignment entailed the addition of a steel post-tensioned parking level to an existing precast parking structure at Ruby Memorial Hospital. The additional level added 105 cars to the garage’s capacity, and required extensive strengthening of the existing structure to support the incremental load. Once the structure of the precast garage was augmented with support members tied in to the original grade beams, the steel components were added to create the new parking level. All steel surfaces were sheathed in precast covers to visually integrate the newly constructed level with the existing structure. The garage was kept open during construction activities to support the needs of the hospital.

 

View Case Study

Read Article in Modern Steel Construction


Category: New Parking Structure Projects

Industry: Commercial

Location: Cheektowaga (Buffalo), NY

Contact Info: Mr. Roy Brunner, Pyramid Management Group, Inc., Syracuse, NY, (315) 657-1123

Value: $6,900,000

Date of Completion: Fall 2007

Contract Award Date: January 2007

% of Cost of Work Performed With CWC Forces: 20%

Project Description:

The project consists of a 963-car, 5-level, 270,000 sq. ft. design/build precast parking structure (400 spaces on grade) in conjunction with the redevelopment of Walden Galleria as a lifestyle center.


2006


Category: New Parking Structure Projects

Industry: Commercial

Location: Perth Amboy, New Jersey

Size: 3 level, 83,000 SF substructure

Capacity: 117 spaces

Value: $600,000

Date of Completion: Spring 2006



Category: New Parking Structure Projects

Industry: Government

Location: Fairmont, WV

Project Owner: City of Fairmont, WV, Jay Rogers (304) 367-0490

Architect: Omni Associates, Steve Barnum (304) 367-1417

Value: $3,500,000

Start Date: Summer 2005

Date of Completion: Spring 2006

Engineer: Stroud, Pence & Associates, Ed Pence

CWC Contract: $3,500,000

% of Cost of Work Performed With CWC Forces: 10%

Project Description:

The project is a 3-level (grade plus 2 supported levels), pre-cast concrete parking structure which provides 225 parking spaces. The project has approximately 50,000 sq. ft. of structural area and an additional 20,000 sq. ft. of area on grade for a total area of approximately 70,000 sq. ft.  The project entailed extensive use of thin-set brick panels and expansive glass in the main stair/elevator enclosure as its primary architectural features.



Category: New Parking Structure Projects

Industry: Government

Location: Pittsburgh, PA

Architect: Indovina Associates Architects, Brian Roth, (412) 363-3800 and Rob Indovina, (412) 363-3800

Value: $15,000,000

Start Date: Fall 2005

Date of Completion: Fall 2006

Construction Manager:  Zambrano Corporation, Brad Smith, (412) 968-5400

CWC Contract: $2,670,000

Project Description:

The project consisted of a new exhibit area for polar bears, walruses and sea otters with adjacent facilities for related equipment and support staff. CWC work included providing the CIP concrete structural frame for the enclosure buildings and the concrete pools, tanks and perimeter walls for the exhibit area and adjacent facilities. Architectural finishes are by others. Scope of work consists of 14,000 sq. ft. of supported structural area, 53,000 sq. ft. of perimeter wall area, plus various tanks and pools.



Category: New Parking Structure Projects

Industry: Hospital

Location: Pittsburgh, PA

Project Owner: Medical Center, Bill Barrett, (412) 469-7090 and Steve Kelly, (412) 469-7155

Architect: WTW Architects, Bill Fullerton, (412) 321-0551 x 512

Value: $8,319,432

Start Date: Fall 2005

Date of Completion: Fall 2006

Engineer: Churches Consulting Engineers, Chuck Churches, (724) 663-5522

CWC Contract: $8,740,000

% of Cost of Work Performed With CWC Forces: 10 - 20%

Project Description:

The project consists of a 5-level (grade plus 4 supported levels) CIP, P/T concrete parking structure to accommodate 535 parking spaces. Architectural metal panels are used for the facade  treatment. The project is constructed on an existing surface parking lot on a hilltop behind the hospital complex. The work also included the construction of a new access road from a lower parking lot 50? + below.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: McCaffery Interests, Chicago, IL

Contact Info: Construction Manager: Plant Construction, Mr. Craig Allison (415) 281-0686

Value: $6,396,285

Date of Completion: Fall 2006

CWC Contract: $6,396,285

% of Cost of Work Performed With CWC Forces: 10-20%

Project Description:

The project consists of a 3-level, 126,000 sq. ft.  mixed-use precast concrete parking structure to accommodate 427 parking spaces and 60,000 sq. ft.  of retail space. The parking structure is intended to service the Cork Factory apartment development located in the strip district of Pittsburgh, PA. The Cork Factory is a historic industrial building originally built in 1901 and currently being redeveloped into 295 loft apartments.

View Video


2005


Category: New Parking Structure Projects

Industry: University

Location: Pittsburgh, PA

Project Owner: Carnegie Mellon University, Joe Greenway, (412) 268-6823

Value: $2,200,000

Start Date: Summer 2005

Date of Completion: Fall 2005

Owners Rep: Oxford Development Corp., Chad Wheatley, (412) 261-1500

Engineer: Simpson Gumpertz & Heger Inc., (781) 907-9000

Construction Manager: Mosites Construction, Mark Edgar, (412) 923-2255

CWC Contract: $1,000,000

% of Cost of Work Performed With CWC Forces: 100%

Project Description:

CWC provided a CIP P/T concrete deck for this 1-level, 68,000 sq. ft. addition to an existing steel-framed parking structure. The addition accommodated 201 parking spaces. Specifically, CWC provided all forming, reinforcing, post tensioning, and concrete placing and finishing for the project. Some remediation to the existing structure was also provided.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Project Owner: Greyhound Lines, Inc., Paul Verheyden, (214) 849-8170; Dallas,TX, Bob Troy, (214) 849-8170

Architect: IKM,Inc., Tami Green, (412) 281-1337

Value: $2,500,000+

Start Date: Spring 2005

Date of Completion: Summer 2005

Leaseholder: Pittsburgh Parking Authority, Chris Holt, (412) 560-2520

Engineer: Baker Engineering, Brad Duda, (724) 495-4090

Construction Manager:  Massaro Company, Pat Stone, (412) 963-2800

CWC Contract: $1,300,000+

% of Cost of Work Performed With CWC Forces: 50%

Project Description:

CWC provided a variety of construction services to relocate the Greyhound Bus Terminal to a temporary relocation facility on a surface parking lot. The scope of work included site modifications including site utility relocation, curbing and paving. The work also included coordinating the installation of a temporary modular terminal facility with loading platforms, exterior canopies, interior fit-outs, plumbing, lighting and electric requirements. The project is to be used to accommodate about 40 intercity bus arrivals and departures a day until the new permanent terminal facility is built in 2-3 years. Greyhound Lines is the owner of the facility. The Pittsburgh Parking Authority owns the land and leases it to Greyhound. PPA will also operate the new parking facility associated with the new bus terminal when it is completed.



Category: New Parking Structure Projects

Industry: Airport

Location: Charleston, WV

Contact Info: Richard Atkins, Airport Director, Central WV Regional Airport Authority, (304) 344-8033

Start Date: Winter 2004

Date of Completion: Summer 2005

CWC Contract Value: $6.75 million

Project Description:

New construction: 4 1/2 levels, 157,000 SF, 06 parking spaces, precast concrete structure


2004



Category: New Parking Structure Projects

Industry: Commercial

Location: Farmington, PA

Contact Info: Pete Magerko, Project Director, (800) 422-2736

Start Date: Summer 2004

Date of Completion: Fall 2004

CWC Contract Value: $4.3 million

Project Description:

New Construction: 4-level, 74,936 SF, cast-in-place, post-tensioned concrete decks supported by a steel frame, built into a hillside. Top level is a plaza deck to hold a 19,000 sq. ft. media center.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Contact Info: Melissa Bilec, URA Project Manager (Owner), ( 412) 255-6600

Value: $12,000,000

Start Date: Fall 2003

Date of Completion: Fall 2004

CWC Contract Value: $3,890,000 (General Contract)

Project Description:

New Construction: 7-level, 340,000 SF, 868-car, prestressed, precast concrete parking structure.



Category: New Parking Structure Projects

Industry: Commercial

Location: Huntington, WV

Contact Info: Davis, Tri-State Transit Authority (Owner), (304) 529-6904

Value: $8,500,000. This project is part of a 2-structure contract valued at $13,500,000.

Start Date: Summer 2003

Date of Completion: Summer 2004

Project Description:

New Construction: 3-level, 250,000 SF, 390-car, prestressed, precast concrete parking structure with steel-framed shell space for a future theater on top.



Category: New Parking Structure Projects

Industry: Commercial

Location: Huntington, WV

Contact Info: Paul Davis, Tri-State Transit Authority, (304) 529-6904

Value: $5,000,000. This project is part of a 2-structure contract valued at $13,500,000.

Start Date: Summer 2003

Date of Completion: Summer 2004

Project Description:

New Construction: 3-level, 200,000 SF, 600-car, prestressed, precast concrete parking structure.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Contact Info: Martin Kaminski, URA Project Manager (Owner), (412) 255-6600

Value: $12,000,000

Date of Completion: Winter 2004

CWC Contract Value: $2,200,000 (General Contract)

Project Description:

New Construction: 4-level, 140,000 SF, 409-car, prestressed, precast concrete parking structure.


2003



Category: New Parking Structure Projects

Industry: Government

Location: Akron, OH

Contact Info: James McCarthy, County of Akron-Owner, (330) 643-2015

Value: $7,100,000.00

Date of Completion: Fall 2003

% of Cost of Work Performed With Own Forces: 10%

Project Description:

New Construction: 2-story vertical expansion, cast-in-place concrete frame with cast-in-place, post-tensioned concrete decks with P/C concrete facade and pedestrian bridge across street to courthouse.



Category: New Parking Structure Projects

Industry: Hospital

Location: Morgantown, WV

Contact Info: Robert Carubia, Assistant Vice President/WVU HSC Facilities, (304) 598-4274

Value: $2,400,000.00

Date of Completion: Summer 2003

Project Description:

New Construction: Design/Build: 225-car, prestressed, precast concrete structure.



Category: New Parking Structure Projects

Industry: Commercial

Location: Parkersburg, WV

Contact Info: Ann Conageski, Federal Projects Administrator, (304) 424-8418

Value: $5,088,000.00

Date of Completion: Fall 2003

Project Description:

New Construction: Design/Build: 378-car, multi-story parking deck with transit offices.



Category: New Parking Structure Projects

Industry: Commercial

Location: Morgantown, WV

Contact Info: Tom Arnold, Parking Authority, (304) 284-7435

Value: $4,000,000.00

Date of Completion: Fall 2003

Project Description:

New Construction: 215-car, prestressed, precast concrete parking garage.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Contact Info: Melissa Bilec, URA Project Manager (Owner), (412) 255-6417

Value: $2,300,000.00

Date of Completion: Fall 2003

Project Description:

New Construction: General trades package including site work, foundations and interior/exterior finishes for the URA, City of Pittsburgh. CWC was responsible for site coordination and supervision of this multiple prime contract project.


2002



Category: New Parking Structure Projects

Industry: Corporate

Location: Jersey City, NJ

Contact Info: Tony Scavo, The Lefrak Organization, Owner/Developer, (718) 575-4628

Value: $2,500,000

Date of Completion: Spring 2002

% of Cost of Work Performed With Own Forces: 10%

Project Description:

New Construction and Construction Management: 206-car, 2-level addition to existing structure. Steel frame with CIP, post-tensioned concrete decks and P/C concrete facade treatments.



Category: New Parking Structure Projects

Industry: Government

Location: Beaver County, PA

Contact Info: Ron Kretz, Baker & Associates, Architect/Engineer, (724) 495-7711

Value: $3,031,027

Date of Completion: Fall 2002

% of Cost of Work Performed With Own Forces: 30%

Project Description:

New Construction: 254-car, three-story steel frame, cast-in-place, post-tensioned concrete decks with P/C concrete facade.



Category: New Parking Structure Projects

Industry: Hospital

Location: Mineola, NY

Contact Info: Ralph Lambert; Axis Construction Group (Construction Manager), (631) 243-5970

Value: $9,000,000

Date of Completion: Summer 2002

Contract Value: $6,000,000

% of Cost of Work Performed With Own Forces: 10%

Project Description:

New Construction: Design/Build: 680-car, steel frame with CIP/PT concrete deck and P/C concrete facade.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Contact Info: Tim Dittmar; Forest City Construction-Owner/Developer, (216) 416-3653

Capacity: 406 cars

Value: $3,500,000

Date of Completion: Summer 2002

% of Cost of Work Performed With Own Forces: 40%

Project Description:

New Construction: Design/Build: 406 cars, 2-story vertical expansion, steel frame with CIP/PT concrete deck and P/C concrete facade.

 

View the PNC Park Case Study



Category: New Parking Structure Projects

Industry: Commercial

Location: Morris Plains, NJ

Contact Info: Gerry Coppola, Roseland Construction, Owner/Developer, (973) 218-2380

Value: $1,318,000.00

Date of Completion: Fall 2002

% of Cost of Work Performed With Own Forces: 10%

Project Description:

New Construction: Design/Build: 1-level, pre-cast concrete deck.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Contact Info: Rosina Vento, Property Manager, Associated Estates Realty Corp. (Owner), (412) 391-9833

Value: $998,525.00

Date of Completion: Winter 2002

% of Cost of Work Performed With Own Forces: 20%


2001



Category: New Parking Structure Projects

Industry: Government

Location: Wilkes Barre, PA

Contact Info: Tom Leonard; Pasonic Engineers, Engineer, (570) 823-4712

Value: $3,800,000

Date of Completion: Fall 2001

% of Cost of Work Performed With Own Forces: 10%

Project Description:

New Construction: 350-car, two-story, vertical expansion, pre-stressed precast concrete parking structure.



Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Architect: Rich DeYoung, WTW Architects, (412) 321-0550

Value: $23,000,000

Date of Completion: Spring 2001

Construction Manager: Rick Funk, Massaro, (412) 321-8278

V.P. Operations: Robert J. Sklarsky, (412) 963-2800

CWCG Contract Value: $2,000,000

% of Cost of Work Performed With Own Forces: 60%

Project Description:

New Construction: 800-car, 8-level, prestressed, precast concrete parking structure.

 

View the PNC Park Case Study


2000



Category: New Parking Structure Projects

Industry: University

Location: Indiana, PA

Architect: Rich DeYoung, WTW Architects, (412) 321-0550

Contact Info: Ron Wolf; Indiana University of Pennsylvania, (724) 357-2289

Value: $5,123,000

Date of Completion: Fall 2000

% of Cost of Work Performed With Own Forces: 20%

Project Description:

New Construction: 417-car, prestressed, precast, free-standing concrete structure.


1999


Category: New Parking Structure Projects

Industry: Commercial

Location: Pittsburgh, PA

Contact Info: Bob Hicks; Parkway Corporation of Pittsburgh LP, Owner/Developer, (215) 575-4092

Value: $300,000

Date of Completion: Fall 1999

% of Cost of Work Performed With Own Forces: 10%

Project Description:

Demolish existing 3-story concrete buildings and build new surface parking lot.



Category: New Parking Structure Projects

Industry: Commercial

Location: Jersey City, NJ

Contact Info: Anthony Scavo, Lefrak Organization, Owner/Developer, (718) 575-4628

Value: $4,150,000

Date of Completion: Fall 1999

% of Cost of Work Performed With Own Forces: 40%

Project Description:

Design/Build: 2-floor vertical expansion, (147,000 sq. ft.) steel frame, P/T concrete.


1998



Category: New Parking Structure Projects

Industry: Corporate

Location: Wayne, PA

Contact Info: Jim Lutz; Liberty Property Trust, Owner/Developer, (610) 648-1759

Value: $2,000,000

Date of Completion: Fall 1998

% of Cost of Work Performed With Own Forces: 10%

Project Description:

Design/Build: 235-car, prestressed, precast concrete structure.


1997



Category: New Parking Structure Projects

Industry: Corporate

Value: $3,500,000

Date of Completion: Fall 1997

% of Cost of Work Performed With Own Forces: 25%

Project Description:

Design/Build: 500-car, prestressed, precast concrete structure.



Category: New Parking Structure Projects

Industry: Government

Location: Hollidaysburg, PA

Contact Info: Blaise Michaels; Blair County Commissioners, Owner, (814) 693-3025

Value: $2,000,000

Date of Completion: Fall 1997

% of Cost of Work Performed With Own Forces: 20%

Project Description:

New Construction: 200-car, prestressed, precast concrete structure.