Commercial
2011 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 1999
2011
Mount Lebanon SpringHill Suites GarageCategory: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Project Owner: Kratsas Properties
Assignment: Design Build
Size: 60,000 Square Feet
Capacity: 81 Vehicles
Value: $3,006,017.00
Date of Completion: Fall 2011
2007
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Project Owner: McCaffrey Interests
Contact Info: Ethnie Richardson (703) 351-9500
Assignment: Retaining Wall Installation
Value: $2.2 Million
Date of Completion: Fall 2007
Project Description: This assignment entailed installation of a steel, king-pile retaining wall along the bank of the Allegheny River. The wall provides support for the River Walk, which allows Cork Factory residents direct access to the picturesque riverbank. The wall also protects the site from erosion and flooding. The structure is an integral component of a new marina complex that is currently under construction.
View Video
Walden Galleria - The EATery - Parking StructureCategory: New Parking Structure Projects
Industry: Commercial
Location: Cheektowaga (Buffalo), NY
Contact Info: Mr. Roy Brunner, Pyramid Management Group, Inc., Syracuse, NY, (315) 657-1123
Value: $6,900,000
Date of Completion: Fall 2007
Contract Award Date: January 2007
% of Cost of Work Performed With CWC Forces: 20%
Project Description: The project consists of a 963-car, 5-level, 270,000 sq. ft. design/build precast parking structure (400 spaces on grade) in conjunction with the redevelopment of Walden Galleria as a lifestyle center.
2006
The Landings at HarborsideCategory: New Parking Structure Projects
Industry: Commercial
Location: Perth Amboy, New Jersey
Size: 3 level, 83,000 SF substructure
Capacity: 117 spaces
Value: $600,000
Date of Completion: Spring 2006
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Project Owner: McCaffery Interests, Chicago, IL
Contact Info: Construction Manager: Plant Construction, Mr. Craig Allison (415) 281-0686
Value: $6,396,285
Date of Completion: Fall 2006
CWC Contract: $6,396,285
% of Cost of Work Performed With CWC Forces: 10-20%
Project Description: The project consists of a 3-level, 126,000 sq. ft. mixed-use precast concrete parking structure to accommodate 427 parking spaces and 60,000 sq. ft. of retail space. The parking structure is intended to service the Cork Factory apartment development located in the strip district of Pittsburgh, PA. The Cork Factory is a historic industrial building originally built in 1901 and currently being redeveloped into 295 loft apartments.
View Video
2005
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Project Owner: Greyhound Lines, Inc., Paul Verheyden, (214) 849-8170; Dallas,TX, Bob Troy, (214) 849-8170
Architect: IKM,Inc., Tami Green, (412) 281-1337
Value: $2,500,000+
Start Date: Spring 2005
Date of Completion: Summer 2005
Leaseholder: Pittsburgh Parking Authority, Chris Holt, (412) 560-2520
Engineer: Baker Engineering, Brad Duda, (724) 495-4090
Construction Manager: Massaro Company, Pat Stone, (412) 963-2800
CWC Contract: $1,300,000+
% of Cost of Work Performed With CWC Forces: 50%
Project Description: CWC provided a variety of construction services to relocate the Greyhound Bus Terminal to a temporary relocation facility on a surface parking lot. The scope of work included site modifications including site utility relocation, curbing and paving. The work also included coordinating the installation of a temporary modular terminal facility with loading platforms, exterior canopies, interior fit-outs, plumbing, lighting and electric requirements. The project is to be used to accommodate about 40 intercity bus arrivals and departures a day until the new permanent terminal facility is built in 2-3 years. Greyhound Lines is the owner of the facility. The Pittsburgh Parking Authority owns the land and leases it to Greyhound. PPA will also operate the new parking facility associated with the new bus terminal when it is completed.
2004
 Category: New Parking Structure Projects
Industry: Commercial
Location: Farmington, PA
Contact Info: Pete Magerko, Project Director, (800) 422-2736
Start Date: Summer 2004
Date of Completion: Fall 2004
CWC Contract Value: $4.3 million
Project Description: New Construction: 4-level, 74,936 SF, cast-in-place, post-tensioned concrete decks supported by a steel frame, built into a hillside. Top level is a plaza deck to hold a 19,000 sq. ft. media center.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Contact Info: Melissa Bilec, URA Project Manager (Owner), ( 412) 255-6600
Value: $12,000,000
Start Date: Fall 2003
Date of Completion: Fall 2004
CWC Contract Value: $3,890,000 (General Contract)
Project Description: New Construction: 7-level, 340,000 SF, 868-car, prestressed, precast concrete parking structure.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Huntington, WV
Contact Info: Davis, Tri-State Transit Authority (Owner), (304) 529-6904
Value: $8,500,000. This project is part of a 2-structure contract valued at $13,500,000.
Start Date: Summer 2003
Date of Completion: Summer 2004
Project Description: New Construction: 3-level, 250,000 SF, 390-car, prestressed, precast concrete parking structure with steel-framed shell space for a future theater on top.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Huntington, WV
Contact Info: Paul Davis, Tri-State Transit Authority, (304) 529-6904
Value: $5,000,000. This project is part of a 2-structure contract valued at $13,500,000.
Start Date: Summer 2003
Date of Completion: Summer 2004
Project Description: New Construction: 3-level, 200,000 SF, 600-car, prestressed, precast concrete parking structure.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Contact Info: Martin Kaminski, URA Project Manager (Owner), (412) 255-6600
Value: $12,000,000
Date of Completion: Winter 2004
CWC Contract Value: $2,200,000 (General Contract)
Project Description: New Construction: 4-level, 140,000 SF, 409-car, prestressed, precast concrete parking structure.
2003
 Category: New Parking Structure Projects
Industry: Commercial
Location: Parkersburg, WV
Contact Info: Ann Conageski, Federal Projects Administrator, (304) 424-8418
Value: $5,088,000.00
Date of Completion: Fall 2003
Project Description: New Construction: Design/Build: 378-car, multi-story parking deck with transit offices.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Morgantown, WV
Contact Info: Tom Arnold, Parking Authority, (304) 284-7435
Value: $4,000,000.00
Date of Completion: Fall 2003
Project Description: New Construction: 215-car, prestressed, precast concrete parking garage.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Contact Info: Melissa Bilec, URA Project Manager (Owner), (412) 255-6417
Value: $2,300,000.00
Date of Completion: Fall 2003
Project Description: New Construction: General trades package including site work, foundations and interior/exterior finishes for the URA, City of Pittsburgh. CWC was responsible for site coordination and supervision of this multiple prime contract project.
2002
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Contact Info: Tim Dittmar; Forest City Construction-Owner/Developer, (216) 416-3653
Capacity: 406 cars
Value: $3,500,000
Date of Completion: Summer 2002
% of Cost of Work Performed With Own Forces: 40%
Project Description: New Construction: Design/Build: 406 cars, 2-story vertical expansion, steel frame with CIP/PT concrete deck and P/C concrete facade.
View the PNC Park Case Study
 Category: New Parking Structure Projects
Industry: Commercial
Location: Morris Plains, NJ
Contact Info: Gerry Coppola, Roseland Construction, Owner/Developer, (973) 218-2380
Value: $1,318,000.00
Date of Completion: Fall 2002
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: Design/Build: 1-level, pre-cast concrete deck.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Contact Info: Rosina Vento, Property Manager, Associated Estates Realty Corp. (Owner), (412) 391-9833
Value: $998,525.00
Date of Completion: Winter 2002
% of Cost of Work Performed With Own Forces: 20%
2001
 Category: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Architect: Rich DeYoung, WTW Architects, (412) 321-0550
Value: $23,000,000
Date of Completion: Spring 2001
Construction Manager: Rick Funk, Massaro, (412) 321-8278
V.P. Operations: Robert J. Sklarsky, (412) 963-2800
CWCG Contract Value: $2,000,000
% of Cost of Work Performed With Own Forces: 60%
Project Description: New Construction: 800-car, 8-level, prestressed, precast concrete parking structure.
View the PNC Park Case Study
1999
Chatham Site Parking LotCategory: New Parking Structure Projects
Industry: Commercial
Location: Pittsburgh, PA
Contact Info: Bob Hicks; Parkway Corporation of Pittsburgh LP, Owner/Developer, (215) 575-4092
Value: $300,000
Date of Completion: Fall 1999
% of Cost of Work Performed With Own Forces: 10%
Project Description: Demolish existing 3-story concrete buildings and build new surface parking lot.
 Category: New Parking Structure Projects
Industry: Commercial
Location: Jersey City, NJ
Contact Info: Anthony Scavo, Lefrak Organization, Owner/Developer, (718) 575-4628
Value: $4,150,000
Date of Completion: Fall 1999
% of Cost of Work Performed With Own Forces: 40%
Project Description: Design/Build: 2-floor vertical expansion, (147,000 sq. ft.) steel frame, P/T concrete.
|