Hospital
2007 | 2006 | 2003 | 2002
2007
 Category: New Parking Structure Projects Industry: Hospital Location: Morgantown, WV
Project Owner: West Virginia University Hospitals
Contact Info: Josh Clavis (304) 598-4125
Assignment: Vertical expansion of garage
Type of Assignment: Design/build
Capacity: 355 cars
Value: $2 Million
Date of Completion: Summer 2007
Project Description: This assignment entailed the addition of a steel post-tensioned parking level to an existing precast parking structure at Ruby Memorial Hospital. The additional level added 105 cars to the garage’s capacity, and required extensive strengthening of the existing structure to support the incremental load. Once the structure of the precast garage was augmented with support members tied in to the original grade beams, the steel components were added to create the new parking level. All steel surfaces were sheathed in precast covers to visually integrate the newly constructed level with the existing structure. The garage was kept open during construction activities to support the needs of the hospital.
View Case Study
2006
 Category: New Parking Structure Projects Industry: Hospital Location: Pittsburgh, PA
Project Owner: Medical Center, Bill Barrett, (412) 469-7090 and Steve Kelly, (412) 469-7155
Architect: WTW Architects, Bill Fullerton, (412) 321-0551 x 512
Value: $8,319,432
Start Date: Fall 2005
Date of Completion: Fall 2006
Engineer: Churches Consulting Engineers, Chuck Churches, (724) 663-5522
CWC Contract: $8,740,000
% of Cost of Work Performed With CWC Forces: 10 - 20%
Project Description: The project consists of a 5-level (grade plus 4 supported levels) CIP, P/T concrete parking structure to accommodate 535 parking spaces. Architectural metal panels are used for the facade treatment. The project is constructed on an existing surface parking lot on a hilltop behind the hospital complex. The work also included the construction of a new access road from a lower parking lot 50? + below.
2003
 Category: New Parking Structure Projects Industry: Hospital Location: Morgantown, WV
Contact Info: Robert Carubia, Assistant Vice President/WVU HSC Facilities, (304) 598-4274
Value: $2,400,000.00
Date of Completion: Summer 2003
Project Description: New Construction: Design/Build: 225-car, prestressed, precast concrete structure.
2002
 Category: New Parking Structure Projects Industry: Hospital Location: Mineola, NY
Contact Info: Ralph Lambert; Axis Construction Group (Construction Manager), (631) 243-5970
Value: $9,000,000
Date of Completion: Summer 2002
Contract Value: $6,000,000
% of Cost of Work Performed With Own Forces: 10%
Project Description: New Construction: Design/Build: 680-car, steel frame with CIP/PT concrete deck and P/C concrete facade.
|