Carl Walker Construction

Hospital

Hospital

2007  |  2006  |  2003  |  2002


2007



Category: New Parking Structure Projects

Industry: Hospital

Location: Morgantown, WV

Project Owner: West Virginia University Hospitals

Contact Info: Josh Clavis (304) 598-4125

Assignment: Vertical expansion of garage

Type of Assignment: Design/build

Capacity: 355 cars

Value: $2 Million

Date of Completion: Summer 2007

Project Description:

This assignment entailed the addition of a steel post-tensioned parking level to an existing precast parking structure at Ruby Memorial Hospital. The additional level added 105 cars to the garage’s capacity, and required extensive strengthening of the existing structure to support the incremental load. Once the structure of the precast garage was augmented with support members tied in to the original grade beams, the steel components were added to create the new parking level. All steel surfaces were sheathed in precast covers to visually integrate the newly constructed level with the existing structure. The garage was kept open during construction activities to support the needs of the hospital.

 

View Case Study


2006



Category: New Parking Structure Projects

Industry: Hospital

Location: Pittsburgh, PA

Project Owner: Medical Center, Bill Barrett, (412) 469-7090 and Steve Kelly, (412) 469-7155

Architect: WTW Architects, Bill Fullerton, (412) 321-0551 x 512

Value: $8,319,432

Start Date: Fall 2005

Date of Completion: Fall 2006

Engineer: Churches Consulting Engineers, Chuck Churches, (724) 663-5522

CWC Contract: $8,740,000

% of Cost of Work Performed With CWC Forces: 10 - 20%

Project Description:

The project consists of a 5-level (grade plus 4 supported levels) CIP, P/T concrete parking structure to accommodate 535 parking spaces. Architectural metal panels are used for the facade  treatment. The project is constructed on an existing surface parking lot on a hilltop behind the hospital complex. The work also included the construction of a new access road from a lower parking lot 50? + below.


2003



Category: New Parking Structure Projects

Industry: Hospital

Location: Morgantown, WV

Contact Info: Robert Carubia, Assistant Vice President/WVU HSC Facilities, (304) 598-4274

Value: $2,400,000.00

Date of Completion: Summer 2003

Project Description:

New Construction: Design/Build: 225-car, prestressed, precast concrete structure.


2002



Category: New Parking Structure Projects

Industry: Hospital

Location: Mineola, NY

Contact Info: Ralph Lambert; Axis Construction Group (Construction Manager), (631) 243-5970

Value: $9,000,000

Date of Completion: Summer 2002

Contract Value: $6,000,000

% of Cost of Work Performed With Own Forces: 10%

Project Description:

New Construction: Design/Build: 680-car, steel frame with CIP/PT concrete deck and P/C concrete facade.